Planning poker cards: what each card means

A planning poker deck looks simple, but every card has a specific meaning. Here is what each one says, how teams use the special cards, and how to pick a deck.

On this page
  1. The standard deck at a glance
  2. The number cards, one by one
  3. The special cards
  4. Which deck should your team use?
  5. A worked example
  6. Common mistakes with the deck
  7. Physical or online cards
  8. Frequently asked questions

Planning poker cards are the values each estimator can vote with during a round of planning poker. A typical deck contains 0, 1/2, 1, 2, 3, 5, 8, 13, 20, 40 and 100, plus a few special cards: a question mark for "I can't estimate this", an infinity sign for "too big to estimate", and often a coffee cup for "I need a break". The numbers are relative sizes, usually story points, not hours or days.

This guide goes through the deck card by card, explains how teams actually use the special cards, and helps you choose between the common decks. For the rules of the game itself, see the planning poker guide.

The standard deck at a glance

A widely used deck follows a modified Fibonacci sequence. The small values are close together; the large values are far apart, because the bigger a piece of work is, the less precisely anyone can size it.

CardWhat it saysTypical use
0No meaningful effortAlready done, or a trivial change bundled with other work
1/2TinyA one-line fix with almost no risk
1, 2, 3SmallWell-understood stories the team finishes quickly
5, 8MediumNormal sprint-sized stories with some unknowns
13LargeFits in a sprint, but splitting is worth considering
20, 40Very largeProbably too big for one sprint; split before planning
100HugeAn epic, a rough placeholder for long-range planning
?I can't estimate thisMissing information or knowledge
InfinityToo big to estimateThe item needs to be broken down first
CoffeeI need a breakThe session has gone on too long

The number cards, one by one

0 and 1/2

A 0 does not mean "free". It means the work is so small, or so covered by another story, that it should not add to the sprint total. A typical case: changing a label that another story already touches. The 1/2 card exists for tiny but real work, such as fixing a typo in an error message. Some teams remove both cards because they encourage arguments about very small items. If your team rarely uses them, that is a reasonable choice.

1 to 8

These are the workhorse cards. Most stories a team builds in a sprint land somewhere between 1 and 8. The difference between neighbouring cards is meaningful: a 5 is clearly bigger than a 3, and an 8 is clearly bigger than a 5. If people keep hesitating between two neighbouring values, compare the story with the team's reference stories instead of debating the number.

13

A 13 is a warning card. It says the story probably fits in a sprint, but it is large enough that something could go wrong. Many teams treat 13 as the largest value they accept into Sprint Planning without a splitting discussion.

20, 40 and 100

These cards are for items that are not ready to be built. They help with rough, long-range sizing: "this feature is about a 40" tells the Product Owner it is several sprints of work. Before any of these items is planned, it should be split into stories that land at 13 or below. The values are deliberately rounded, because nobody can tell a 38 from a 42.

The special cards

The question mark

A "?" means "I don't have enough information to vote". It is a valid and useful vote, not a refusal to take part. When it appears, ask what is missing. If the answer is a business question, the Product Owner can often answer it on the spot. If it is a technical unknown, the team may agree on a short, time-boxed spike and estimate the story afterwards.

Infinity

The infinity card says "this is too big to estimate as it is". It is a stronger signal than 100. When several people play it, stop estimating and split the item.

The coffee card

The coffee cup means "I need a break". It gives people a polite way to say their concentration has run out. Estimation is tiring, and votes made by a tired team are worse than votes after ten minutes away. When someone plays it, take the break.

Agree on what the special cards mean before the first session. A one-line explanation at the top of the agenda avoids confusion when someone plays a "?" for the first time.

Which deck should your team use?

DeckValuesBest for
Modified Fibonacci0, 1/2, 1, 2, 3, 5, 8, 13, 20, 40, 100Most Scrum teams estimating stories in points
Fibonacci0, 1, 2, 3, 5, 8, 13, 21, 34Teams that prefer the pure sequence
T-shirtXS, S, M, L, XL, XXLEarly, rough sizing of large backlogs and epics
Powers of 20, 1, 2, 4, 8, 16, 32, 64Teams that like doubling as the step between sizes
CustomAny values you defineTeams with an established scale of their own

If you have no strong preference, start with modified Fibonacci. It is widely known, and the rounded large values discourage false precision. Our guide to Fibonacci estimation explains why growing gaps work. Use a t-shirt deck when the goal is a quick first pass over many items, and switch to numbers when stories get close to a sprint.

Whatever you pick, keep it stable. Changing decks every few sprints makes past estimates and velocity hard to compare.

A worked example

A team of five votes on "Show delivery estimates on the product page". The cards come up: 3, 5, 5, ?, 13.

The question mark comes from the tester, who does not know whether delivery estimates depend on the customer's address. The 13 comes from a developer who assumed they do, which means calling a carrier service. The Product Owner clarifies: for now, one fixed estimate per country is enough. The team votes again: 3, 3, 5, 3, 3. The team records 3.

Without the question mark and the high card, the team might have agreed on 5 and built the wrong thing.

Common mistakes with the deck

  • Adding in-between values. Introducing a 4 or a 6 invites arguments about precision nobody has.
  • Ignoring the "?" card. Treating it as a non-vote hides the very uncertainty the round should surface.
  • Planning with 40s and 100s. These are placeholders for big items, not commitments for a sprint.
  • Different decks for different stories. Use one deck per backlog so estimates add up.

Physical or online cards

Physical cards work well when everyone is in one room. You can print a set with our printable planning poker cards. For remote or hybrid teams, an online deck keeps votes hidden until the reveal for everyone at once. Scrum Poker offers Fibonacci, modified Fibonacci, T-shirt, powers of 2 and custom decks. Every deck includes the "?" card and the coffee card is optional. There is no infinity card: play "?" or the highest value and split the item.

Frequently asked questions

What are the numbers on planning poker cards?

A widely used deck has 0, 1/2, 1, 2, 3, 5, 8, 13, 20, 40 and 100, plus special cards such as a question mark, infinity and a coffee cup.

What does the question mark card mean in planning poker?

It means the voter does not have enough information to estimate. The team should find out what is missing before voting again.

What does the coffee card mean?

The coffee card means the voter needs a break. It gives people a polite way to say the session has gone on too long.

What does the infinity card mean?

Infinity means the item is too big to estimate as it is. It should be split into smaller stories before the team estimates it.

Which planning poker deck is best?

Modified Fibonacci and plain Fibonacci are common choices for story points. T-shirt sizes work well for rough sizing of large backlogs. The most important thing is to keep one deck consistently.