Choose the deck
Type at least one value, for example 1, 2, 3, 5, 8.
Preview
The print dialog shows the sheets at real size. Print at 100% scale, without "fit to page", so the cards keep their size.
How to print and cut the cards
Pick the deck your team uses, decide how many cards go on a page, and press Print the cards. Only the cards are sent to the printer: the rest of this page is left out. Each sheet is a grid of cards separated by dashed cut lines, so one straight cut with scissors or a paper trimmer frees a whole row.
- Use heavy paper. Card stock, or the heaviest paper your printer accepts, keeps the value from showing through when the card lies face down.
- Print at 100% scale. The grid is sized to fit inside the printable area of both A4 and Letter, so there is no need to shrink it.
- Turn on background printing for the backs. The navy backs are a background colour. If they come out white, enable "background graphics" in the print dialog.
- Print one deck per estimator. Everyone who votes needs a full set of values in their hand.
If your printer prints on both sides, tick the backs option and choose double-sided printing, flipped on the long edge. Each page of faces is followed by a page of backs laid out as a mirror image, so the two sides line up. If your printer is single-sided, plain white backs work as well. What matters is that nobody can read a card before the reveal.
Which deck to print
The values on the cards are the scale your team estimates with. The tool offers the same decks as the online app.
- Fibonacci: 0, 1, 2, 3, 5, 8, 13, 21, 34. A common choice for story points. See why the gaps grow.
- Modified Fibonacci: 0, ½, 1, 2, 3, 5, 8, 13, 20, 40, 100. Round numbers at the top, a half point at the bottom.
- T-shirt sizes: XS, S, M, L, XL, XXL. Good for early, rough sizing. More in the T-shirt sizing guide.
- Powers of 2: 0, 1, 2, 4, 8, 16, 32, 64. Every card is double the one before.
- Custom: type any values, separated by commas. Use this for a shorter scale, such as 1, 2, 3, 5, 8, or for words.
Two extra cards are optional. The "?" card means "I do not know enough to estimate this". The coffee card means "I need a break". Both are worth printing: they give people a polite way to say something that is hard to say out loud. The guide to planning poker cards explains each card in detail.
Worked example: cards for a team of six
A team with six estimators uses the Fibonacci deck with the "?" card and the coffee card. That is 9 values plus 2 extra cards, so 11 cards per person.
- At 9 standard cards per page, one deck takes 2 pages. Six decks take 12 pages.
- At 16 small cards per page, one deck fits on a single page. Six decks take 6 pages.
- At 4 large cards per page, one deck takes 3 pages. This size is meant for a deck that has to be read from across a room.
The team prints the small size six times, cuts the sheets, and has a deck for everyone in a few minutes. The product owner and other observers usually do not need a deck, because only the people who do the work vote.
Paper cards or an online room
Paper cards work well when everyone sits at the same table. The rules of planning poker stay the same: pick a card in private, put it face down, and turn all cards over together.
When part of the team is remote, paper stops working, because cards held up to a camera are hard to read and easy to change after seeing the others. For remote planning poker you can start a free session instead. It uses the same decks, votes stay secret until the reveal, and nobody has to sign up. People in the room can join from their phone by scanning a QR code.
Frequently asked questions
Are these planning poker cards free to print?
Yes. The generator is free, needs no sign-up, and runs in your browser. Print as many decks as your team needs.
What paper size do the cards fit?
The sheets fit both A4 and Letter. The card grid stays inside the printable area of either size, so print at 100% scale without fit to page.
How many decks do I need?
One deck per person who estimates. A team of six developers and testers needs six decks. The product owner usually does not vote and does not need one.
Can I save the cards as a PDF?
Yes. Press Print the cards and choose Save as PDF as the destination in your browser's print dialog. You can then send the file to a print shop or to a colleague.