To run planning poker for Jira issues without a plugin, copy the issue keys and titles you want to estimate, paste them one per line as the agenda of an online planning poker session, estimate each issue with your team, then copy or download the results and enter the agreed story points back into Jira. It takes a few extra minutes per session, and it works with any Jira setup because nothing needs to be installed.
To be clear from the start: Scrum Poker has no Jira integration and no Jira plugin. It does not read from or write to Jira. The workflow below is manual by design, and this guide explains how to keep it quick and error-free.
Why estimate without a plugin
Marketplace apps that connect estimation directly to Jira exist, and for some teams they are the right choice. Many teams still prefer a separate tool, for practical reasons:
- No admin approval. Installing a Jira app usually needs an administrator and sometimes a security review. A browser-based session needs neither.
- Guests can vote. Contractors, people from another team or a new hire without a Jira licence can join from a link.
- No write access to the backlog. The estimation tool cannot change issues by mistake, because it never touches them.
- The same tool for every team. Teams on different trackers, or with no tracker at all, can estimate the same way.
The cost is the manual step at each end. With twenty issues, that is a few minutes of copying and pasting.
The Jira concepts you need
You only need a few standard Jira ideas for this workflow:
| Jira concept | What it does in this workflow |
|---|---|
| Issue key (for example SHOP-142) | Identifies each issue, so you can match estimates back to the right one |
| Backlog or a saved filter | Gives you the list of issues to estimate, in priority order |
| Story points field | Holds the estimate on each issue; its exact name depends on your Jira project setup |
| CSV import | Jira can import data from CSV files, which can help with large batches if your setup and permissions allow it |
Jira editions and configurations differ, so this guide does not name menu paths. If you are not sure where the story points field or the import option lives in your instance, ask your Jira administrator once and note the answer for the team.
The workflow, step by step
- Pick the issues. Before the session, open the backlog or a filter showing the issues you want to estimate. Twenty to thirty is plenty for an hour.
- Copy keys and titles. Build a plain list with one issue per line, key first: SHOP-142 Save a delivery address. Keeping the key at the start of each line is what makes the return trip reliable.
- Paste the list as the agenda. Open a session and paste the list. In Scrum Poker, each line becomes a story in the agenda and the session steps through them in order.
- Share the session. Send the link in the meeting chat, or show the QR code on the shared screen so people can join from their phones.
- Estimate. For each issue, open it in Jira on the shared screen if the team needs the details, then vote in secret, reveal and discuss. Agree on a value and move to the next one.
- Export the results. At the end, copy the summary as text or download it as a CSV file. Because the issue key is part of each story title, it stays next to the agreed estimate.
- Update Jira. Type each estimate into the story points field of its issue. For large batches, your team can use Jira's CSV import instead, if your setup allows it.
A worked example
A team of six refines its backlog every Wednesday. Before the session, the Scrum Master opens a saved filter of issues marked as ready for estimation and copies this list:
SHOP-142 Save a delivery address
SHOP-147 Show delivery estimates on the product page
SHOP-151 Remove a saved card
SHOP-153 Filter orders by status
The team estimates the four issues in about twenty minutes using a Fibonacci deck. SHOP-147 sparks a discussion about carrier data and is split: the team asks the Product Owner to create a new issue for country-level estimates and leaves SHOP-147 for later. The final summary reads 5, 3 and 2 for the other three issues, with SHOP-147 skipped.
The Scrum Master downloads the CSV, then opens each of the three issues in Jira and types the value into the story points field. The whole return trip takes about two minutes. The new issue from the split goes into next week's list.
Tips for a smooth round trip
Keep titles short
Long Jira summaries become hard to read on a shared screen and on phones. Trim them to what the team needs to recognise the issue; the key links back to the details.
Estimate only refined issues
If an issue has no acceptance criteria, the session turns into a refinement meeting, and estimating user stories works best when the questions are answered beforehand. Filter those out first, or run a separate backlog refinement session.
Keep one deck
Use the same deck your Jira estimates already use, usually a Fibonacci deck, so the values you type back match the scale your velocity is based on.
Record skipped issues
Issues that were split, skipped or parked should get a comment or label in Jira so the next session picks them up.
Common mistakes
- Dropping the issue key. Without the key at the start of each line, matching estimates back to issues becomes guesswork.
- Waiting days to update Jira. Sprint Planning then works from a backlog without estimates.
- Estimating in the Jira issue comments. Typing votes in a visible thread anchors everyone on the first number. Secret voting is the point of planning poker.
- Pasting fifty issues. A long agenda tires the team. Estimate what the next one or two sprints need.
When a plugin makes more sense
If your team estimates hundreds of issues a month and the manual step has become a real cost, a Jira marketplace app that writes estimates directly may be worth the setup. For most teams estimating a few dozen issues per sprint, the copy and paste workflow is quicker to start, works for guests, and keeps your Jira configuration untouched. For distributed teams, our guide to remote planning poker has more facilitation tips.
Frequently asked questions
Does Scrum Poker integrate with Jira?
No. Scrum Poker has no Jira integration or plugin. You copy issue keys and titles into a session, estimate them, then copy or download the results and enter the estimates in Jira yourself.
How do I run planning poker with Jira issues?
Copy the keys and titles of the issues you want to estimate, paste them one per line as the agenda of an online session, estimate with your team, then update the story points field of each issue in Jira.
Do participants need a Jira account to vote?
Not with this workflow. People join the estimation session from a link or QR code, so guests without a Jira licence can vote.
Can I import planning poker estimates into Jira from a CSV file?
Jira can import data from CSV files, but what an import can update depends on your Jira edition, configuration and permissions. Check with your Jira administrator before relying on it.