A Sprint Retrospective is the Scrum event that closes each Sprint, where the Scrum Team inspects how the last Sprint went, with regard to individuals, interactions, processes, tools and its Definition of Done, and plans ways to increase quality and effectiveness. The Scrum Guide 2020 timeboxes it to a maximum of three hours for a one-month Sprint; shorter Sprints usually need less. Its output is a small number of concrete improvements the team commits to, some of which may go into the next Sprint Backlog.
The retrospective is easy to run badly. The same three people talk, the same complaints come up, and nothing changes. This guide gives you a simple agenda that works for most teams, five formats to vary the conversation, and a method to turn findings into actions that stick. For a short definition, see the glossary entry.
What the retrospective is for
The retrospective is about how the team works, not what it built. The Sprint Review looks at the product; the retrospective looks at the process. Typical topics include collaboration, communication, tools, the flow of work, quality and the way the team plans and estimates.
It is the whole Scrum Team's event: the Developers, the Product Owner and the Scrum Master. Managers and stakeholders usually do not attend, because people need to speak openly about what did not work.
The test of a good retrospective is simple: did something change in the next Sprint because of it? A pleasant conversation that changes nothing has missed its purpose.
A simple agenda
A widely used structure, described by Esther Derby and Diana Larsen in their book Agile Retrospectives, has five stages. Here it is with timings for a one-hour retrospective after a two-week Sprint.
| Stage | Time | What happens |
|---|---|---|
| Set the stage | 5 min | State the goal, remind the team of the ground rules, a quick check-in from everyone |
| Gather data | 15 min | Collect facts and feelings about the Sprint using one of the formats below |
| Generate insights | 15 min | Group the notes, vote on the most important themes, discuss causes |
| Decide what to do | 15 min | Agree one to three concrete actions with an owner each |
| Close | 10 min | Review the actions, a short appreciation round, feedback on the retrospective itself |
Start the gathering stage by reviewing the actions from the last retrospective. Were they done? Did they help? That keeps the loop closed and shows the team its decisions matter.
Five retrospective formats
The format shapes the "gather data" stage. Changing it every few Sprints helps the team see the same work from a different angle.
1. Start, stop, continue
Three columns: what the team should start doing, stop doing and continue doing. It is direct and action-oriented, which makes it a good default. It works less well when the team needs to talk about feelings or tensions, because it pushes straight to behaviour.
2. The 4Ls
Four columns: Liked, Learned, Lacked, Longed for. The "Learned" column brings out knowledge the team gained, and "Longed for" invites ideas that would not appear in a list of problems. Useful after a Sprint with a lot of new work.
3. Mad, sad, glad
Three columns for emotions about the Sprint. It gives people permission to name frustrations and disappointments as well as wins. Use it when you sense tension, or after a difficult Sprint. The facilitator needs to steer the insights stage toward causes, not blame.
4. Sailboat
Draw a boat heading toward an island. The island is the team's goal, the wind is what pushes the team forward, anchors are what hold it back, and rocks are risks ahead. The metaphor helps teams talk about risks and goals, not only the past Sprint.
5. What went well, what to improve
Two columns and nothing more. It is the quickest format and suits short Sprints or a team that wants a light retrospective. Add a third column for actions if the team tends to stop at listing problems.
Turning findings into actions
Many retrospectives fail at this stage. The team lists twenty observations and agrees to "communicate better". Here is a more reliable method.
- Vote on themes. Give each person three votes to place on the grouped notes. Take the top one to three themes.
- Find a cause. For each theme, ask why it happened until you reach something the team can influence.
- Write a specific action. An action names what will be done, by whom and by when. "Pair on every story that touches billing next Sprint, Sam to set it up on Monday" is an action. "Better testing" is not.
- Keep it small. One to three actions per Sprint. A team that tries to fix everything at once usually fixes nothing.
- Make it visible. Add improvement actions to the Sprint Backlog or a visible board, so they compete for time like any other work.
At the next retrospective, check each action. If it was done, decide whether to keep the change. If it was not, ask why before adding new ones.
Reviewing estimation accuracy
The retrospective is a good moment to look at how the team estimates, because estimation problems show up as missed plans and late surprises. The aim is to learn, not to grade individual estimates.
A simple exercise takes fifteen minutes. Pick three to five stories from the Sprint that felt very different from their estimate. For each, ask:
- What did we know when we estimated, and what did we learn later?
- Could we have found that out during refinement?
- Is there a pattern, such as stories touching one system always running over?
Then look at the Sprint as a whole. If the team planned 24 points and finished 17, was the plan above recent velocity, did capacity change, or were stories bigger than estimated? Each cause has a different fix. Common patterns, such as estimating under pressure or anchoring on one voice, are covered in estimation anti-patterns.
Do not change the original estimates of finished stories. They are the record of what the team believed at the time, and changing them hides the lesson. Instead, update your reference stories if the scale has drifted.
Common mistakes
- Skipping it when busy. Busy Sprints are when the retrospective has the most to work on.
- The same format forever. Rotate formats so the conversation does not turn into a ritual.
- Too many actions. One to three, each with an owner, is enough.
- No follow-up. Start each retrospective by checking the previous actions.
- Blaming individuals. Focus on the system the team works in. People speak openly only when it is safe to do so.
- Running over the timebox. Keep within the time the team agreed. A tight retrospective with one real action beats a long one with none.
After the retrospective, the next Sprint starts with Sprint Planning. Bring the agreed actions into that meeting so they are planned alongside the rest of the work.
Frequently asked questions
What is the purpose of a Sprint Retrospective?
To inspect how the last Sprint went, in terms of people, interactions, processes, tools and the Definition of Done, and to agree concrete improvements for the next Sprint.
How long should a Sprint Retrospective be?
The Scrum Guide 2020 sets a maximum of three hours for a one-month Sprint. Shorter Sprints usually need less; many teams on two-week Sprints use about an hour.
Who attends the Sprint Retrospective?
The whole Scrum Team: the Developers, the Product Owner and the Scrum Master. Managers and stakeholders usually do not attend, so people can speak openly.
What are good retrospective formats?
Common formats include start, stop, continue; the 4Ls (liked, learned, lacked, longed for); mad, sad, glad; the sailboat; and what went well, what to improve. Rotating them keeps the conversation fresh.
How many action items should come out of a retrospective?
One to three, each specific, with an owner and a time. A small number of actions that actually happen is more useful than a long list.